2019
Verification of flowmeters of water and steam and check of balance water / steam on boiler VB4 in power plant Dětmarovice
2018 - 2019
Tuning of pressure controller on FGD in power plant Dětmarovice
2019
Tisová power plant terminal - implementation of secondary control controlled by Slovak TSO
2017 - 2019
Design, commissioning and optimization of boiler load and combustion control circuits for K2, K3, K5 a K6 boilers in power plant Opatovice