zde se nacházíte:
Homepage > News > HPP Bergvik – model test in Litostroj Engineering

HPP Bergvik – model test in Litostroj Engineering

05/06/2022

At the beginning of January 2022, the model test of HPP Bergvik’s new runner was arranged in hydraulic laboratory of Litostroj Engineering (Czech republic). This runner was designed by Slovenian company Litostroj Power for Swedish company Fortum.

OSC Company took part of model test as a Fortum’s representative and consultant.

All the tests were performed in accordance with intended range. The results correspond to the outputs from internal tests of Litostroj Company and certify the accomplishment of all the required guaranties.