| 1 | Project and implementation of steam turbine 120 MW control in power station Ambarli (Turkey) | Power plant Ambarli (Turkey) | 2011 - 2012 |
| 2 | Control loop tuning and units ancillary services certification in power plant Prunéřov 1 | ČEZ, a.s. - Power plant Prunéřov 1 | 2007 - 2012 |
| 3 | Certification measurement of ancillary services “primary, secondary a tertiary power control” in power plant Opatovice | Elektrárny Opatovice, a.s. - Power plant Opatovice | 2004 - 2012 |
| 4 | Implementation of boiler control algorithms in heating station Košice (Slovakia) | Teplárna Košice, a.s. - Heating station Košice (Slovakia) | 2011 - 2012 |
| 5 | Feasibility study of operational possibilities of heating station Planá nad Lužnicí to provide ancillary services and certification of ancillary service “quick starting reserve available within 15 minutes“ | AES Bohemia spol. s r.o. - Heating station Planá nad Lužnicí | 2010 - 2011 |
| 6 | Delivery of GPSNTP time servers with active antenna, surge protectors and power supply | AISE, spol. s r.o. | 2011 |
| 7 | Delivery of DT20-6 ethernet LED digital clock | ALES, spol. s r.o. | 2011 |
| 8 | Delivery of GNTP time servers with active antenna, surge protectors and power supply | ALES, spol. s r.o. | 2011 |
| 9 | Delivery of GPSNTP time servers with active antenna, surge protectors and power supply | ALES, spol. s r.o. | 2011 |
| 10 | Feasibility study of unit remote control in island operation | ČEPS, a. s. | 2011 |
| 11 | Island mode of distribution system - influence study of distributed energy resources | ČEZ Distribuce, a. s. | 2011 |
| 12 | Hydro system Resita identification measurement of pumping station and hydro power plants before rehabilitation (Romania) | ČEZ Romania - Hydro system Resita (Romania) | 2011 |
| 13 | Feasibility study of changes in ancillary services from January 2013 for ČEZ Central dispatch center and Power plants Terminals | ČEZ, a.s. | 2011 |
| 14 | Delivery of GPSD (GPS central time system) with slave clock driver | ČEZ, a.s. - Hydro power plant Štěchovice | 2011 |
| 15 | Tuning of boiler control loops in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 2003 - 2011 |
| 16 | Delivery of GPSNTP time servers with active antenna | ČEZ, a.s. - Power plant Dětmarovice | 2011 |
| 17 | Control of cooling water flow in power plant Chvaletice - control algorithm design, implementation and operational setup | ČEZ, a.s. - Power plant Chvaletice | 2009 - 2011 |
| 18 | Power plant Terminal project of combined cycle Počerady | ČEZ, a.s. - Power plant Počerady | 2011 |
| 19 | Delivery of GPSNTP time servers with active antenna and power supply | ČEZ, a.s. - Power plant Prunéřov | 2011 |
| 20 | Certification measurement of ancillary service “island operation capability” in power plant Prunéřov 2 | ČEZ, a.s. - Power plant Prunéřov | 2003 - 2011 |
| 21 | Certification measurement of ancillary services “primary, secondary, tertiary power control and island operation” in power plant Prunéřov 2 | ČEZ, a.s. - Power plant Prunéřov 2 | 2003 - 2011 |
| 22 | Control circuits tuning and units preparation for ancillary services certification in power plant Prunéřov 2 | ČEZ, a.s. - Power plant Prunéřov 2 | 2001 - 2011 |
| 23 | Guarantee measurement of boiler dynamic properties after equipment modernization | ČEZ, a.s. - Power plant Prunéřov 2 | 2011 |
| 24 | Certification measurement of ancillary services “quick starting reserve” in pumped storage power plant Štěchovice | ČEZ, a.s. - Pumped storage power plant Štěchovice | 2007 - 2011 |
| 25 | Certification measurement of ancillary services “primary, secondary and tertiary power control” in heating station Olomouc | Dalkia Česká republika, a.s. - Heating station Olomouc | 2005 - 2011 |
| 26 | Certification measurement of ancillary services “primary, secondary, tertiary power control and quick starting reserve available within 15 minutes” in heating station Přerov | Dalkia Česká republika, a.s. - Heating station Přerov | 2005 - 2011 |
| 27 | Preparation, realization and certification of primary control in heating station Přerov | Dalkia Česká republika, a.s. - Heating station Přerov | 2007 - 2011 |
| 28 | Delivery of Power plant Terminal for power plant Malženice (Slovakia), implementation of support to provide ancillary services, power supply control, measuring and evaluation of gas consumption | E.ON Elektrárne, s.r.o. - Power plant Malženice (Slovakia) | 2011 |
| 29 | Delivery of information center for power plant Malženice (Slovakia) - data and terminal function accessible via intranet and internet, support for production planning and evaluation | E.ON Elektrárne, s.r.o.. - Power plant Malženice (Slovakia) | 2011 |
| 30 | Identification measurement of Kaplan turbine before reconstruction in hydro power plant Betsele (Sweden) | E.ON Vattenkraft Sverige AB - Hydro power plant Betsele (Sweden) | 2011 |
| 31 | Guarantee measurement of Kaplan turbine in small hydro power plant Vír II | E.ON, a.s. - Small hydro power plant Vír II | 2011 |
| 32 | Performance tests of Francis turbines at hydro power plant Santa Barbara (Nicaragua) | Enel Nicaragua - Hydro power plant Santa Barbara (Nicaragua) | 2011 |
| 33 | Feasibility study of dispatch centers for renewable energy resources | Euroenergy, spol. s r.o. | 2011 |
| 34 | Power plant Terminal project of heating station Prostějov | Gama Investment, a.s. - Heating station Prostějov | 2011 |
| 35 | Upgrade of Power plant Terminal in combined cycle Bratislava (Slovakia) afrer new power unit construction | PPC Energy, a.s. - Combined cycle Bratislava (Slovakia) | 2010 - 2011 |
| 36 | Upgrade of Power plant Terminal and information center in Combined cycle Bratislava (Slovakia) to fulfil ancillary service requirements (tertiary power control available within 10 minutes) | PPC Power, a.s., PPC Energy a.s. - Combined cycle Bratislava (Slovakia) | 2011 |
| 37 | Shutdown tests on water supply pipe at waterworks Káraný | Pražské vodárny, s.p. - Water company Káraný | 2011 |
| 38 | Delivery of GPSNTP time servers with active antenna, surge protectors and power supply | ProjectSoft HK, a.s. | 2011 |
| 39 | Status identification of boiler technology in Power plant Deva (Romania) | S.C. Electrocentrale Deva S.A. - Power plant Deva (Romania) | 2011 |
| 40 | Delivery of GPSNTP time servers with active antenna, surge protectors and power supply | Siprin, spol. s r.o. | 2011 |
| 41 | Optimization of on-cam correlation at Kaplan turbine in hydro power plant Orava (Slovakia) | Slovenské elektrárne, a.s. - Hydro power plant Orava (Slovakia) | 2011 |
| 42 | Ancillary services certification measurement “primary, secondary and tertiary power control” in Combined cycle Vřesová | Sokolovská uhelná, právní nástupce, a.s. - Combined cycle Vřesová | 2001 - 2011 |
| 43 | Measurement of pressure, vibration and noise at polyjet of hydro power plant Trollheim (Norway) | Statkraft Energi AS - Hydro power plant Trollheim (Norway) | 2010 - 2011 |
| 44 | Duplication of Power plant Terminal in heating station Trmice | Teplárna Trmice, a.s. - Heating station Trmice | 2011 |
| 45 | Duplication of Power plant Terminal in heating station Červený mlýn | Teplárny Brno, a.s. - Heating station Červený mlýn | 2011 |
| 46 | Hydro power plants Eldforsen (Sweden) - tests relevant to Kaplan turbine during putting into operation | Hydro power plant Eldforsen (Sweden) | 2010 |
| 47 | Pressure and vibration measurement in the water spray sealing of hydro power plant Josefův Důl | Hydro power plant Josefův Důl | 2010 |
| 48 | Hydro power plant Poechos (Peru) - tests relevant to Kaplan turbines during putting into operation | Hydro power plant Poechos (Peru) | 2010 |
| 49 | Delivery of power plant terminal to provide ancillary service “quick starting reserve available within 15 minutes” for heating station Planá nad Lužnicí | AES Bohemia spol. s r.o. - Heating station Planá nad Lužnicí | 2010 |
| 50 | Delivery of 3 pieces of GPSNTP time servers with active antenna, overvoltage protections and power supply | AISE, s.r.o. | 2009 - 2010 |
| 51 | Delivery of 1 piece of GPSNTP time server with active antenna | Autocont CZ, a.s. | 2010 |
| 52 | Island mode of distribution systems - technical specification of active separation of islands for areas Neznášov south, Neznášov north, Opočínek, Přerov and Lískovec | ČEZ Distribuce, a. s. | 2009 - 2010 |
| 53 | Optimization of on-cam correlation on Kaplan turbine, turboset vibration and noise measurement in small hydro power plant Hracholusky | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Hracholusky | 2010 |
| 54 | Guarantee measurement of Kaplan turbine in small hydro power plant Kníničky | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Kníničky | 2010 |
| 55 | Optimization of on-cam correlation at Kaplan turbine in small hydro power plant Předměřice | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Předměřice | 2010 |
| 56 | Guarantee measurement of Kaplan turbines in small hydro power plant Spytihněv | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Spytihněv | 2009 - 2010 |
| 57 | Extension of presentation layer technology in an intranet environment of ČEZ for data display of commercial activities | ČEZ, a.s. | 2010 |
| 58 | Upgrade of control system KOTEL in Dispatch Center ČEZ and upgrade of power plant terminals to provide for ancillary service according to conditions for year 2011 (quick starting reserve available within 15 minutes, asymmetric secondary power control, diagram changes during ancillary services providing) | ČEZ, a.s. | 2010 |
| 59 | Determination of turbo-set operation diagram in hydro power plant Slapy | ČEZ, a.s. - Hydro power plant Slapy | 2003 - 2010 |
| 60 | Diagnostics of reasons of high carbon content in fly ash in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 2010 |
| 61 | Energetic parameters measurement and judgment of ceramic coating ARC 32 influence in cooling water pump in power plant Chvaletice | ČEZ, a.s. - Power plant Chvaletice | 2009 - 2010 |
| 62 | Assessment of abilities of unit in power plant Prunéřov 1 for certification of ancillary service “secondary power control” and “tertiary power control” | ČEZ, a.s. - Power plant Prunéřov 1 | 2010 |
| 63 | Proposal, modification and tuning of control circuits for transition of units Prunéřov 1 from turbine-follow mode into boiler-follow mode operation | ČEZ, a.s. - Power plant Prunéřov 1 | 2002 - 2010 |
| 64 | Migration of control system (WDPF II to Ovation) of units B21 and B22 in power plant Prunéřov 2 – system migration, put into operation, start-up | ČEZ, a.s. - Power plant Prunéřov 2 | 2010 |
| 65 | Control of cooling water flow in power plant Tušimice - design of control algorithm | ČEZ, a.s. - Power plant Tušimice | 2010 |
| 66 | Governor tests of reverse Francis turbines before and after control system replacement in pump storage plant Dlouhé Stráně | ČEZ, a.s. - Pumped storage power plant Dlouhé Stráně | 2007 - 2010 |
| 67 | Feasibility study of operating options of heating station Karviná to provide ancillary services and Study on possible configurations of fictive unit according to Grid Code | Dalkia Česká republika, a.s. - Heating station Karviná | 2010 |
| 68 | Certification of ancillary services “primary power control”, “tertiary power control” and “quick starting reserve available within 15 minutes” at heating station Karviná | Dalkia Česká republika, a.s. - Heating station Karviná | 2010 |
| 69 | Terminal duplication of heating station Karviná and preparation for direct connection to ČEPS Dispatch Center. | Dalkia Česká republika, a.s. - Heating station Karviná | 2010 |
| 70 | Certification of ancillary service “quick starting reserve available within 15 minutes“ at fictive unit of heating station Olomouc | Dalkia Česká republika, a.s. - Heating station Olomouc | 2010 |
| 71 | Upgrade of heating stations Olomouc and Přerov terminals to provide ancillary service “quick starting reserve available within 15 minutes” | Dalkia Česká republika, a.s. - Heating station Olomouc, Heating station Přerov | 2010 |
| 72 | Certification measurement of ancillary services “secondary and tertiary power control” of fictive unit in heating station Trmice | Dalkia Česká republika, a.s. - Heating station Ústí nad Labem | 2005 - 2010 |
| 73 | Certification of ancillary service “quick starting reserve available within 15 minutes“ in plant Kolin-Zalabi | Dalkia Kolín, a.s. - Power plant Kolín | 2010 |
| 74 | Upgrade of plant Kolin terminal to provide ancillary service “quick starting reserve available within 15 minutes” | Dalkia Kolín, a.s. - Power plant Kolín | 2010 |
| 75 | Guarantee measurement of Francis turbines in small hydro power plant Soběnov | E.ON Trend s.r.o. - Small hydro power plant Soběnov | 2009 - 2010 |
| 76 | Identification measurement of Francis turbines before reconstruction in hydro power plant Lapino (Poland) | ENERGA Elektrownie Straszyn Sp. z o.o. - Small hydro power plant Lapino (Poland) | 2010 |
| 77 | Guarantee measurement of Francis turbines in small hydro power plant Meziboří | Energo-Pro Czech, s.r.o. - Hydro power plant Meziboří | 2010 |
| 78 | Guarantee measurement of Pelton turbines (thermodynamics method) and governors in hydro power plant Zrnovci (Macedonia) | MacHydro Project, a.d. - Hydro power plant Zrnovci (Macedonia) | 2010 |
| 79 | Guarantee measurement of Kaplan and Francis turbines in small hydro power plant Nymburk | MVE Hydro, s.r.o. - Small hydro power plant Nymburk | 2010 |
| 80 | Guarantee measurement of Francis turbines in small hydro power plant Ampelgading (Indonesia) | PLN
Indonesia - Hydro power plant Amplegading (Indonesia) | 2010 |
| 81 | Connection of newly built unit for biomass combustion (Plzeňská teplárenská) to terminal of heating station Plzeň | Plzeňská teplárenská, a.s. - Heating station Plzeň | 2010 |
| 82 | Guarantee measurement of Kaplan turbine in small hydro power plant Troja | Povodí Vltavy, s.p. - Small hydro power plant Troja | 2010 |
| 83 | Guarantee measurement of Kaplan turbine in small hydro power plant Labská | První ekologická, a.s. - Small hydro power plant Labská | 2010 |
| 84 | Feasibility study of ancillary services providing according to Grid Code for Příbramská teplárenská and certification measurement of ancillary service "primary control" in heating station Příbram | Příbramská teplárenská, a.s. - Heating station Příbram | 2009 - 2010 |
| 85 | Guarantee measurement of Kaplan turbine in small hydro power plant Rendelstein (Italy) | Rendelstein GmbH - Small hydro power plant Rendelstein (Italy) | 2010 |
| 86 | Exchange of combustion turbine GE control system in power plant Fellside (Great Britain) – reimplementation of algorithms | Sellafield CHP, Ltd. - Power plant Fellside | 2009 - 2010 |
| 87 | Optimization of on-cam correlation at Kaplan turbine in hydro power plant Kostolná (Slovakia) | Slovenské elektrárne, a.s. - Hydro power plant Kostolná (Slovakia) | 2010 |
| 88 | Delivery of power plant terminal and certification of ancillary service "tertiary power control" in fictive unit of heating station Teplárna Otrokovice | Teplárna Otrokovice, a.s. - Heating station Otrokovice | 2009 - 2010 |
| 89 | Certification of ancillary service “quick starting reserve available within 15 minutes“ at fictive unit of heating station Otrokovice | Teplárna Otrokovice, a.s. - Heating station Otrokovice | 2010 |
| 90 | Upgrade of heating station Trmice terminal to provide ancillary service “quick starting reserve available within 15 minutes” | Teplárna Trmice, a.s. - Heating station Trmice | 2010 |
| 91 | Certification of ancillary service “quick starting reserve available within 15 minutes“ at fictive unit of heating station Trmice | Teplárna Trmice, a.s. - Heating station Trmice | 2010 |
| 92 | Project of power plant terminal for newly built peak power plant Brno - North | Teplárny Brno, a.s. | 2010 |
| 93 | Certification of ancillary service “quick starting reserve available within 15 minutes“ and “dispatcher reserve available within 30 minutes” at combined cycle Červený mlýn | Teplárny Brno, a.s. - Combined cycle heating station Červený mlýn | 2006 - 2010 |
| 94 | Certification measurement of ancillary services “secondary and tertiary power control” in combined cycle heating station Červený mlýn | Teplárny Brno, a.s. - Combined cycle heating station Červený mlýn | 2002 - 2010 |
| 95 | Guarantee measurement of low-head Kaplan turbines before and after reconstruction in hydro power plant Tiszalök | Tiszavíz Vízerömü Kft - Hydro power plant Tiszalök (Hungary) | 2004 - 2010 |
| 96 | Delivery of 1 piece of GPSNTP time server with active antenna | University of California, Santa Barbara (USA) | 2010 |
| 97 | Guarantee measurement of Kaplan turbines in small hydro power plant Penz (Austria) | VAEE - Small hydro power plant Penz (Austria) | 2010 |
| 98 | Optimization of on-cam correlation on Kaplan turbine in hydro power plant Lakatnik (Bulgaria) | VEZ SVOGHE - Small hydro power plant Lakatnik (Bulgaria) | 2010 |
| 99 | Upgrade of power plant Burštýn (the Ukraine) terminal with redundancy of all units and installation GPSD for time synchronization | Zakhidenergo - Power station Burštýn (the Ukraine) | 2010 |
| 100 | Delivery of 1 piece of GPSNTP time server with active antenna | Astronomický ústav AV ČR, v.v.i. | 2009 |
| 101 | Connection of power plant terminals to nett energy trade measurement in ČEZ, a.s. | ČEZ, a.s. | 2009 |
| 102 | Modification of control system KOTEL in Dispatch centre of ČEZ for control of nett energy delivery error of ČEZ, a.s. | ČEZ, a.s. | 2009 |
| 103 | Miniterminal instalation for heating plant Dvur Kralove nad Labem monitoring by CEZ Dispatch Center | ČEZ, a.s. - Heating station Dvůr Králové nad Labem | 2009 |
| 104 | Energetic parameters measurement and judgment of ceramic coating ARC 32 influence in cooling water pump in nuclear power plant Dukovany | ČEZ, a.s. - Nuclear power plant Dukovany | 2008 - 2009 |
| 105 | Cooling pump operation control in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 2006 - 2009 |
| 106 | Certification measurement of ancillary services “primary, secondary and tertiary power control” and “operating reserve” in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 2006 - 2009 |
| 107 | Study on possibilities of ancillary services control changes and their testing in power plant Počerady | ČEZ, a.s. - Power plant Počerady | 2009 |
| 108 | Turboset vibration and noise measurement before reconstruction in small hydro power plant Kníničky | ČEZ, a.s. - Small hydro power plant Kníničky | 2009 |
| 109 | Efficiency and flow measurement of Kaplan turbine in small hydro power plant Lipno II | ČEZ, a.s. - Small hydro power plant Lipno II | 2009 |
| 110 | Power plant terminals modification in heating stations Olomouc, Přerov and Ústí nad Labem for cooperation with Damas Energy systém | Dalkia Česká republika, a.s. - Heating station Olomouc, Heating station Přerov, Heating station Ústí nad Labem | 2009 |
| 111 | Preparation of TG5 in Dalkia Kolín to provide ancillary service "primary power control" | Dalkia Kolín, a.s. - Power plant Kolín | 2009 |
| 112 | Preparation of fictive unit Dalkia Ústí nad Labem to provide ancillary service "secondary power control" including certification of this ancillary service in certain operation modes of fictive unit | Dalkia Ústí nad Labem, a.s. - Heating station Trmice | 2009 |
| 113 | Duplication of communication processor of power plant Opatovice because of reliability increase | Elektrárny Opatovice, a.s. - Power plant Opatovice | 2009 |
| 114 | Guarantee measurement in hydro power plants Hradištko and Kostomlátky | Energo-Pro Czech, s.r.o. - Hydro power plants Hradištko and Kostomlátky | 2007 - 2009 |
| 115 | Delivery of 1 piece of GPSNTP time servers with active antenna and power supply | Landis&Gyr, s.r.o. | 2009 |
| 116 | Guarantee measurement of Pelton turbines using thermodynamics method, measurement of generator loss in hydro power plant Došnica | MacHydro Project, a.d. - Hydro power plant Došnica (Macedonia) | 2009 |
| 117 | Guarantee measurement of Pelton turbines using thermodynamics method, measurement of generator loss in hydro power plant Sapunčica | MacHydro Project, a.d. - Hydro power plant Sapuncica (Macedonia) | 2009 |
| 118 | Turboset noise measurement in small hydro power plant Nymburk | MVE - HYDRO s.r.o. - Small hydro power plant Nymburk | 2009 |
| 119 | Delivery of 2 pieces of GPSNTP time servers with active antenna and extension cord | ProjectSoft HK, a.s. | 2009 |
| 120 | Turboset noise measurement in small hydro power plant Kostelec nad Labem | Rida Consulting, a.s. - Small hydro power plant Kostelec nad Labem | 2009 |
| 121 | Control system replacement of combustion turbines GEC Alsthom in power plant Arar (Saudi Arabia) - setting into operation | SEC - Al Jouf Power plant (Saudi Arabia) | 2009 |
| 122 | Control system replacement of combustion turbine Fiat in power plant Al Jouf (Saudi Arabia) - algorithm implementation and setting into operation | SEC - Al Jouf Power plant (Saudi Arabia) | 2008 - 2009 |
| 123 | Control system replacement of combustion turbine GE in power plant Makkah (Saudi Arabia) - algorithm implementation and setting into operation | SEC - Makkah Power plant (Saudi Arabia) | 2007 - 2009 |
| 124 | Judgement on turboset load decrease of pumped storage power plant Čierny Váh | Slovenské elektrárne, a.s. - Pumped storage power plant Číerny Váh (Slovakia) | 2009 |
| 125 | Guarantee measurement of Kaplan turbine in small hydro power plant Hracholusky | Strojírny Brno, a.s. - Small hydro power plant Hracholusky | 2009 |
| 126 | Guarantee measurement of Kaplan turbines in small hydro power plant Lakatnik and Svrajen (Bulgaria) | VEZ SVOGHE - Small hydro power plant Lakatnik and Svrajen (Bulgaria) | 2009 |
| 127 | Delivery of 4 pieces of GPSNTP time servers with active antenna and power supply | Vodafone Czech Republic, a.s. | 2009 |
| 128 | Delivery of 1 piece of GPSNTP time server with active antenna | ZAT, a.s. | 2009 |
| 129 | Analyse of possibilities and conditions of ancillary services providing in heating station Zlín | Atel Zlín, s.r.o. - Heating station Zlín | 2008 |
| 130 | Island mode of distribution system - specification of islands selected for active island setting up during troubles in electric power system | ČEZ Distribuce, a. s. | 2008 |
| 131 | Simulator for Dispatch centre of ČEZ. It provides staff training and proving of control system KOTEL algorithms. The simulator includes the complete models of the control system, connected power plant terminals and production technology | ČEZ, a.s. | 2008 |
| 132 | Modification of control system KOTEL (Dispatch centre of ČEZ) for balancing of produced energy in trading interval | ČEZ, a.s. | 2008 |
| 133 | Certification measurement of ancillary services “island operation capability” , "black start capability" and “quick starting reserve” in hydro power plant Orlík | ČEZ, a.s. - Hydro power plant Orlík | 2006 - 2008 |
| 134 | Continual measurement of amount of cooling water from Labe river for power plant Melnik | ČEZ, a.s. - Power plants Mělník | 2008 |
| 135 | Connection of terminals of power plants Prunéřov 1 and Prunéřov 2 with voltage node control system in Hradec u Kadaně. It provides remote voltage control from power plants and monitoring from Dispatch centre ČEZ | ČEZ, a.s. - Power plants Prunéřov | 2008 |
| 136 | Monitoring of power plant operation from Dispatch centre of ČEZ for power plants Skawina and Chorzow (both Poland) - instalation of miniterminals | ČEZ, a.s. - Power plants Skawina a Chorzow (Poland) | 2008 |
| 137 | Compliance test and guarantee measurement of control circuits in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2003 - 2008 |
| 138 | Turbo-set guarantee measurement in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2003 - 2008 |
| 139 | Proposal of island operation of heating station Přerov, technical cooperation during modification and test of island operation (self-consumption of heating station) | Dalkia Česká republika, a.s. - Heating station Přerov | 2006 - 2008 |
| 140 | Study on possibilities of operational extension to provide ancillary services for Dalkia ČR, department Ústí nad Labem | Dalkia Česká republika, a.s. - Heating station Trmice | 2007 - 2008 |
| 141 | Feasibility study of black start in heating station Přerov | Dalkia Česká republika, a.s., Divize Přerov - Heating station Přerov | 2008 |
| 142 | Delivery and installation of 1 piece of GPSNTP time server with active antenna and delivery of NTP client (multilicence for 60 users). Time synchronization of client devices in technology network | Elektrárny Opatovice, a.s. - Power plant Opatovice | 2008 |
| 143 | Guarantee measurement in hydro power plant Kroměříž – Strž | Energo-Pro Czech, s.r.o. - Hydro power plant Kroměříž - Strž | 2005 - 2008 |
| 144 | Guarantee measurement of Pelton turbines and generator losses measurement in hydro power plant Patikari | Energy Infratech PVT. LTD. - Hydro power plant Patikari (India) | 2008 |
| 145 | Supervision of Kaplan turbine production in ČKD Blansko for power plant Eldforsen (Sweden) | Fortum Generation AB - Hydro power plant Eldforsen (Sweden) | 2008 |
| 146 | Guarantee measurement of Francis turbines and governors in hydro power plant Concepción | Ismus CE - Hydro power plant Concepción (Panama) | 2008 |
| 147 | Guarantee measurement of Kaplan turbines and governors and generator losses measurement in hydro power plant Matka II | MacHydro Project, a.d. - Hydro power plant Matka (Macedonia) | 2008 |
| 148 | Guarantee measurement of Pelton turbines and governors and generator losses measurement in hydro power plant Pesocani | MacHydro Project, a.d. - Hydro power plant Pesocani (Macedonia) | 2008 |
| 149 | Guarantee measurement of Pelton turbines and governors and generator losses measurement in hydro power plant Sapuncica | MacHydro Project, a.d. - Hydro power plant Sapuncica (Macedonia) | 2008 |
| 150 | Delivery of 5 pieces of GPSNTP time servers with active antenna and power supply | Národní bezpečnostní úřad ČR | 2008 |
| 151 | Software and hardware upgrade for terminal of power plant Burštýn (the Ukraine) - communication with Dispatch centre RDC Lvov via protocol IEC - 870 - 5 - 104, automatic stand-by of control units, frequency measurement and time synchronization from GPS | OAO Zachidenergo - Power plant Burštýn (the Ukraine) | 2002 - 2008 |
| 152 | Guarantee measurement of axial Kaplan turbine in small hydro power plant Rozkoš | Povodí Labe, s.p. - Small hydro power plnat Rozkoš | 2008 |
| 153 | Certification measurement of ancillary service "Island operation" in combined heat and power plant "Paroplyn kombinátu Vřesová" | Sokolovská uhelná, právní nástupce, a.s. - Combined heat and power plant Vřesová | 2007 - 2008 |
| 154 | Optimization of on-cam correlation on Kaplan Turbines in hydro power plant Líšný | TEODICEA, spol. s r.o. - Hydro power plant Líšný | 2007 - 2008 |
| 155 | Study on possibilities of black start in combined cycle heating station Červený mlýn | Teplárny Brno, a.s. - Combined cycle heating station Červený mlýn | 2007 - 2008 |
| 156 | Island mode of distribution systems - solution philosophy and assessment of technical and operational conditions of plants | ČEZ Distribuce, a. s. | 2007 |
| 157 | Voltage control system modification for remote setpoint adjusting in voltage junction in power plants Temelín, Dukovany, Počerady, Chvaletice and Dlouhé Stráně | ČEZ, a.s. | 2002 - 2007 |
| 158 | Terminals modification of power plant ČEZ for Integrated dispatcher system of Transmission System Operator | ČEZ, a.s. | 2007 |
| 159 | Reconstruction of plant data damaged by server failure or by communication failure between power plants and dispatcher center ČEZ in Wonderware Historian | ČEZ, a.s. | 2007 |
| 160 | Updating hydro power plants data lists according to the actual state | ČEZ, a.s. | 2003 - 2007 |
| 161 | Measurement of emergency valve stroke in hydro power plant Orlík | ČEZ, a.s. - Hydro power plant Orlík | 2007 |
| 162 | Delivery of GPS time centers and DA20-8 displays for the renovation of the control system in nuclear power plant Dukovany | ČEZ, a.s. - Nuclear power plant Dukovany | 2000 - 2007 |
| 163 | Certification measurement of ancillary services “island operation capability”, “black start capability” and “quick starting reserve” in pump storage plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2005 - 2007 |
| 164 | Terminals modification of power plant Dalkia Czech Republik for Integrated dispatcher system in Transmission System Operator | Dalkia Česká republika, a.s. | 2007 |
| 165 | Certification of ancillary service DZ60 with extended control margin in Dalkia Czech Republic, division Ústí nad Labem | Dalkia Česká republika, a.s. - Heating station Trmice | 2007 |
| 166 | Power plant terminal delivery, technical cooperation during realization and certification of ancillary service tertiary control in power plant Kolín | Elektrárna Kolín a.s. - Power plant Kolín | 2007 |
| 167 | Study on suitability of ancillary services providing in power plant Kolín, Study on operating possibilities and Study of possible operating configurations and variations in power plant Kolín for ČEPS, a.s. | Elektrárna Kolín a.s. - Power plant Kolín | 2007 |
| 168 | Identification measurement of Francis turbine before reconstruction in hydro power plant Meziboří | Energo-Pro Czech, s.r.o. - Hydro power plant Meziboří | 2007 |
| 169 | Identification measurement of Francis turbine in hydro power plant Seč | Energo-Pro Czech, s.r.o. - Hydro power plant Seč | 2007 |
| 170 | Communication processor extension in power plant Opatovice for monitoring of substation 110 kV from Dispatcher centre of ČEZ Distribuce, a.s. | International Power Opatovice, a.s. - Power plant Opatovice | 2007 |
| 171 | Communication Processor delivery for power plant Opatovice | International Power Opatovice, a.s. - Power plant Opatovice | 2000 - 2007 |
| 172 | Delivery of backed-up dispatcher graphic system (DIGRAST) and backed-up energy measurement system for Jihočeská energetika company | JČE, a.s. | 2000 - 2007 |
| 173 | Guarantee measurement of Francis turbines and governors and generator losses measurement in hydro power plant Pena | MacHydro Project, a.d. - Hydro power plant Pena (Macedonia) | 2007 |
| 174 | Delivery of Power plant terminal for Paroplynový cyklus (PPC), Bratislava, implementation of power supply control, gas consumption measuring and evaluation | Paroplynový cyklus, a.s. - Combined cycle Bratislava (Slovakia) | 2006 - 2007 |
| 175 | Delivery of information center for Paroplynový cyklus Bratislava - making datas and terminal function accessible via intranet and internet | Paroplynový cyklus, a.s. - Combined cycle Bratislava (Slovakia) | 2007 |
| 176 | Optimization of on-cam correlation on Kaplan turbines in hydro power plant Nechranice | Povodí Ohře, s.p. - Hydro power plant Nechranice | 2002 - 2007 |
| 177 | Kaplan turbine guarantee measurement in hydro power plant Orava | Slovenské elektrárne, a.s. - Hydro power plant Orava (Slovakia) | 2006 - 2007 |
| 178 | Study on operating feasibilities for ancillary services providing for heating plant Otrokovice | Teplárna Otrokovice a.s. - Heating station Otrokovice | 2007 |
| 179 | Study of own-consumption determination for evaluation of supplied control power | ČEPS, a.s. | 2006 |
| 180 | Delivery of Presentation Layer for technology data presentation in intranet of company ČEZ, Plc. | ČEZ, a.s. | 2004 - 2006 |
| 181 | Control circuit tests and on-cam optimization of Kaplan turbine in hydro power plant Lipno II | ČEZ, a.s. - Hydro power plant Lipno II | 2006 |
| 182 | Creation and testing of procedure for supervision and execution of control system algorithm modification in nuclear power plant Temelín | ČEZ, a.s. - Nuclear power plant Temelín | 2002 - 2006 |
| 183 | Connection between Power plant Terminal and voltage control system for tertiary voltage control implementation in power plant Mělník 3 | ČEZ, a.s. - Power plants Mělník | 2006 |
| 184 | Power unit examination before certification measurement of “primary, secondary and tertiary power control” and “island operation capability” in power plant Tisová 2 | ČEZ, a.s. - Power plants Tisová | 2006 |
| 185 | Turbine guarantee measurement before and after reconstruction in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2000 - 2006 |
| 186 | Francis turbine guarantee measurement in small hydro power plant Les Království | ČEZ, obnovitelné zdroje, s.r.o. - Hydro power plant Les Království | 2006 |
| 187 | Communication Processor delivery for Energetika Vítkovice company | Energetika Vítkovice, a.s. - Energetika Vítkovice | 2006 |
| 188 | Proposal of airflow control aimed at limitation of NOx emission in power plant Mělník 1 | Energotrans, a.s. - Power plant Opatovice | 2005 - 2006 |
| 189 | Study on black start capability for power plant Opatovice | International Power Opatovice, a.s. - Power plant Opatovice | 2006 |
| 190 | Measurement of turbo-set efficiency and penstock losses in small hydro power plant Sapunčica | MacHydro Project AD - Hydro power plant Sapunčica (Macedonia) | 2006 |
| 191 | Guarantee measurement of Francis turbines and control circuits in hydro power plant Kalimanci | MacHydro Project, a.d. - Hydro power plant Kalimanci (Macedonia) | 2006 |
| 192 | Francis turbine efficiency measurement and collection of data for reconstruction of hydro power plant Matka | MacHydro Project, a.d. - Hydro power plant Matka (Macedonia) | 2006 |
| 193 | Francis turbine efficiency measurement before reconstruction in hydro power plant Pena | MacHydro Project, a.d. - Hydro power plant Pena (Macedonia) | 2006 |
| 194 | Pelton turbine efficiency measurement before reconstruction in hydro power plant Pesocani | MacHydro Project, a.d. - Hydro power plant Pesocani (Macedonia) | 2006 |
| 195 | Pressure conditions tests in penstock of water plant Křižanovice – Práčov | Povodí Labe, s.p. - Water plant Křižanovice - Práčov | 2006 |
| 196 | Kaplan turbine guarantee measurement in hydro power plant Vraňany | Povodí Vltavy, s.p. - Hydro power plant Vraňany | 2006 |
| 197 | Certification measurement of ancillary services “secondary and tertiary power control” in department Teplárna in combined heat and power plant Vřesová | Sokolovská uhelná, právní nástupce, a.s. - Combined cycle Vřesová | 2001 - 2006 |
| 198 | Power plant terminal upgrade – support for automatic stand-by functions for ancillary service control | Sokolovská uhelná, právní nástupce, a.s. - Combined heat and power plant Vřesová | 2006 |
| 199 | Turbo-set guarantee measurement before and after overhaul in hydro power plant Kisköre | Tiszavíz Vízerömü Kft - Hydro power plant Kisköre (Hungary) | 2005 - 2006 |
| 200 | Pressure conditions measurement in the supply pipeline Vír – Brno | Vírský oblastní vodovod | 2006 |
| 201 | Optimization of on-cam correlation on Kaplan Turbines in hydro power plant Žilina | Vodohospodárska výstavba, š.p. - Water plant Žilina | 2006 |
| 202 | Francis turbine guarantee measurement before and after reconstruction in hydro power plant Vydra | ZČE, a.s. - Hydro power plant Vydra | 2005 - 2006 |
| 203 | Efficiency measurement in small hydro power plant Kadaň | Hydro power plant Kadaň | 2005 |
| 204 | Measurement of passive resistances and drive forces before reconstruction in hydro power plant Považská Bystrica | Hydro power plant Povážská Bystrica (Slovakia) | 2005 |
| 205 | Kaplan turbine guarantee measurement in small hydro power plant Přelouč | Hydro power plant Přelouč | 2005 |
| 206 | Pump guarantee measurement in turbine operation mode in water purification plant in Nová Bystrica | Water purification plant Nová Bystrica (Slovakia) | 2005 |
| 207 | Certification methodology proposal for ancillary service “island operation capability” for hydro power plants and its incorporation into the Grid Code | ČEPS, a.s. | 2005 |
| 208 | Delivery of KOTEL (Concentrator of Power plant Terminals) – information and control system of the Central dispatch centre of ČEZ, Plc. The KOTEL system supports operation scheduling, ancillary services provision, group power balancer and distributor, dynamic optimization and control of coal and pumped-storage power plants | ČEZ, a.s. | 2000 - 2005 |
| 209 | Power plant terminals tests during preparation for control system duplication in Dispatch centre of the Transmission System Operator | ČEZ, a.s. | 2005 |
| 210 | Voltage control system modification according to requirements of the Grid Code in power plants Počerady, Chvaletice and Dlouhé Stráně | ČEZ, a.s. | 2005 |
| 211 | Key part Power plant Terminal duplication with automatic stand-by functions for ancillary services control | ČEZ, a.s. | 2005 |
| 212 | Turbo-set efficiency measurement in hydro power plant Lipno | ČEZ, a.s. - Hydro power plant Orlík | 2005 |
| 213 | Cause detection of excessive turbo-set vibrations in hydro power plant Slapy | ČEZ, a.s. - Hydro power plant Slapy | 2005 |
| 214 | Solution proposal and delivery of equipment for island operation of heating plant Karviná | Dalkia Česká republika, a.s. - Heating station Karviná | 2005 |
| 215 | Heating plant terminal connection to transmitted power measurements in heating plant Karviná | Dalkia Česká republika, a.s. - Heating station Karviná | 2005 |
| 216 | Delivery of Power plant terminal for heating plant Olomouc | Dalkia Česká republika, a.s. - Heating station Olomouc | 2005 |
| 217 | Study on possibilities of providing ancillary services in heating plant Olomouc | Dalkia Česká republika, a.s. - Heating station Olomouc | 2005 |
| 218 | Delivery of Power plant terminal for heating station Přerov | Dalkia Česká republika, a.s. - Heating station Přerov | 2004 - 2005 |
| 219 | Delivery of Power plant terminal for heating station Ústí nad Labem | Dalkia Česká republika, a.s. - Heating station Ústí nad Labem | 2004 - 2005 |
| 220 | Putting into operation of a backed-up system for acquisition and evaluation of electrometer data in power plant Opatovice | International Power Opatovice, a.s. - Power plant Opatovice | 2004 - 2005 |
| 221 | System delivery for real-time production monitoring and controlling from the Dispatch centre of Pražská energetika for power plant Opatovice | PRE, a.s. | 2005 |
| 222 | Control power calculation algorithm for operation in secondary active power control of nuclear power plants Bohunice and Mochovce | Slovenské elektrárny, a.s. | 2003 - 2005 |
| 223 | Study on control system implementation in generator room section in combined heat and power plant Vřesová | Sokolovská uhelná, právní nástupce, a.s. - Combined heat and power plant Vřesová | 2004 - 2005 |
| 224 | Delivery of Power plant terminal for heating plant Kyjov | Teplárna Kyjov, a.s. - Heating station Kyjov | 2005 |
| 225 | Delivery of backed-up dispatcher graphic system (DIGRAST) and backed-up energy measurement system with air temperature measurement for Východočeská energetika company including control of power plant Opatovice | VČE, a.s. | 1997 - 2005 |
| 226 | Proposal, delivery and calibration of process flow measurement; optimization of on-cam correlation on Kaplan turbine in hydro power plant Hracholusky | ZČE, a.s. - Hydro power plant Hracholusky | 2005 |
| 227 | Control unit delivery for fuel sampler in power plants Mělník 1, Mělník 3, Poříčí and Tušimice | ČEZ, a.s. | 1998 - 2004 |
| 228 | Determination of turbo-set working diagram in hydro power plant Orlík | ČEZ, a.s. - Hydro power plant Orlík | 2004 |
| 229 | Certification measurement of ancillary service “tertiary power control” in power plant Tisová 1 | ČEZ, a.s. - Power plants Tisová | 2002 - 2004 |
| 230 | Algorithmization, simulation and operational check of separate operation of power plants Dalešice and Dukovany | ČEZ, a.s. - Pumped storage power plant Dalešice | 2004 |
| 231 | Boiler control circuits tuning in heating station Přerov (boilers are connected to steam collector) | Dalkia Česká republika, a.s. - Heating station Přerov | 2004 |
| 232 | Feedwater junction quality evaluation in power plant Mělník 1 | Energotrans, a.s. - Power plant Mělník 1 | 2004 |
| 233 | Tuning of boiler air system in power plant Mělník 1 | Energotrans, a.s. - Power plant Mělník 1 | 2004 |
| 234 | Quality analysis of boiler injection valves by methods of non-impact diagnostics in power plant Mělník 1 | Energotrans, a.s. - Power plant Mělník 1 | 2004 |
| 235 | Review of Grid code proposal for years 2004, 2005 | ERÚ | 2003 - 2004 |
| 236 | Delivery of Power plant terminal for heating plant Plzeňská teplárenská | Plzeňská teplárenská, a.s. | 2001 - 2004 |
| 237 | Ancillary service measurement before certification measurement in hydro power plants Dlouhé stráně, Lipno, Kamýk, Orlík, Slapy, Štěchovice | ČEZ, a.s. | 2002 - 2003 |
| 238 | Level measuring device delivery for hydro power plant Lipno | ČEZ, a.s. - Hydro power plant Lipno | 2003 |
| 239 | Pre-complex control system test in hydro power plant Štěchovice | ČEZ, a.s. - Hydro power plant Štěchovice | 2003 |
| 240 | Proposal and testing of the procedure of changing hardware documentation of the Westinghouse system in nuclear power plant Temelín | ČEZ, a.s. - Nuclear power plant Temelín | 2003 |
| 241 | Certification measurement of ancillary service “island operation capability” in power plant Tušimice 2 | ČEZ, a.s. - Power plant Tušimice | 2003 |
| 242 | Boiler control circuits tuning in heating plant Olomouc | Dalkia Česká republika, a.s. - Heating station Olomouc | 2003 |
| 243 | Certification measurement of ancillary service “primary frequency control” in power plant Třebovice | Dalkia Česká republika, a.s. - Power plant Třebovice | 2003 |
| 244 | Boiler dynamic quality measurement under keeping CO and NOx emission limits and with respect to provision of ancillary services | Energotrans, a.s. - Power plant Mělník 1 | 2003 |
| 245 | State analysis of boiler actuators by methods of non-impact diagnostics in power plant Opatovice | International Power Opatovice, a.s. - Power plant Opatovice | 2003 |
| 246 | Turbine control circuits tuning in hydro power plant Nechranice | Povodí Ohře, s.p. - Hydro power plant Nechranice | 2003 |
| 247 | Pump efficiency measurement in water works Káraný | Pražské vodárny, s.p. - Water company Káraný | 2003 |
| 248 | Efficiency measurement in hydro power plant Čunovo | Slovenské elektrárny, a.s. - Hydro power plant Čunovo (Slovakia) | 2003 |
| 249 | Optimization of on-cam correlation on Kaplan turbine in hydro power plant Gabčíkovo | Slovenské elektrárny, a.s. - Hydro power plant Gabčíkovo(Slovakia) | 2003 |
| 250 | Delivery of Power plant terminal for combined cycle heating station Červený mlýn | Teplárny Brno, a.s. - Combined cycle heating station Červený mlýn | 2002 - 2003 |
| 251 | Development and delivery of ISA-WDOG card for external PLC | Kuwait | 2001 - 2002 |
| 252 | Delivery of DT-100 time displays for Praha-Ruzyně airport | Praha-Ruzyně airport | 2002 |
| 253 | Optimization of on-cam correlation on Kaplan turbines in hydro power plant Kamýk | ČEZ, a.s. - Hydro power plant Kamýk | 2002 |
| 254 | Program creation for feed water and organizer control circuit tests during putting into operation in nuclear power plant Temelín | ČEZ, a.s. - Nuclear power plant Temelín | 2001 - 2002 |
| 255 | Technical support during putting into operation of the Westinghouse control system during start up of nuclear power plant Temelín | ČEZ, a.s. - Nuclear power plant Temelín | 2002 |
| 256 | Proposal and implementation of modifications for unit control range extension in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 2002 |
| 257 | Time synchronization system delivery for control systems in power plant Mělník 3 | ČEZ, a.s. - Power plants Mělník | 2002 |
| 258 | Technical support during test of fictive block capability to provide ancillary service “tertiary power control” in power plant Tisová 1 | ČEZ, a.s. - Power plants Tisová | 2002 |
| 259 | Turbo-set power control circuit tuning in power plant Třebovice | Dalkia Česká republika, a.s. - Power plant Třebovice | 2002 |
| 260 | ID fan operational mode assessment and reliable boiler operation safeguarding in power plant Mělník 1 | Energotrans, a.s. - Power plant Mělník 1 | 2001 - 2002 |
| 261 | Temperature field analysis in exhaust tube before electroseparators, before and after the ID fan in power plant Mělník 1 | Energotrans, a.s. - Power plant Mělník 1 | 2002 |
| 262 | Study on boiler power increase in heating plant SETUZA | Energy Ústí nad Labem, a.s. - Heating station SETUZA | 2002 |
| 263 | Proposal of airflow system, burners reconstruction and boiler control in company Lovochemie Lovosice | Lovochemie, a.s. - Lovochemie Lovosice | 2002 |
| 264 | Boiler control circuits proposal in heating plant Ostrov | Ostrovská teplárenská, a.s. - Heating station Ostrov | 2002 |
| 265 | Project and execution of tests for connecting of the Island of power plant Burštýn to UCPTE | WEPS Lvov - Power plant Burštýn (the Ukraine) | 1998 - 2002 |
| 266 | Delivery of Power plant terminal for power plant Burštýn and upgrade of the Terminal for data communication with unit control systems and with control system of the dispatch centre RDC Lvov | WEPS Lvov - Power plant Burštýn (the Ukraine) | 2000 - 2002 |
| 267 | Turbine guarantee measurement after reconstruction in hydro power plant Ladce | Hydro power plant Ladce | 2001 |
| 268 | Time synchronization system delivery for computer network in Praha-Ruzyně airport | Praha-Ruzyně airport | 2001 |
| 269 | Implementation of island operation in hydro power plant Orlík and Slapy | ČEZ, a.s. | 2001 |
| 270 | Outlet steam pressure control optimization in power plant Chvaletice | ČEZ, a.s. - Power plant Chvaletice | 2001 |
| 271 | Delivery of Power plant terminal for heating plant Karviná | Dalkia Česká republika, a.s. - Heating station Karviná | 2001 |
| 272 | Certification measurement of ancillary service “secondary power control” in heating plant Karviná | Dalkia Česká republika, a.s. - Heating station Karviná | 2001 |
| 273 | Calibration of combustion products flow meter in power plant Mělník 1 using three independent methods | Energotrans, a.s. - Power plant Mělník 1 | 2001 |
| 274 | Study on possibilities of provision of selected ancillary services in heating plant Plzeňská energetika | Plzeňská teplárenská, a.s. | 2001 |
| 275 | Expertise during Controlled Heating Supply System identification in the City of Prague | Pražská teplárenská, a.s. | 2001 |
| 276 | Dynamic tests in hot-water pipes network of Pražská teplárenská company | Pražská teplárenská, a.s. | 2001 |
| 277 | Preparation of fictive block operation for provision of the ancillary service “secondary power control” in department Teplárna in combined heat and power plant Vřesová | Sokolovská uhelná, právní nástupce, a.s. - Combined cycle Vřesová | 2001 |
| 278 | Delivery of Power plant terminal for heating plant Strakonice | Teplárna Strakonice, a.s. - Heating station Strakonice | 2001 |
| 279 | Study on possibilities of provision of selected ancillary services in combined cycle heating station Červený mlýn | Teplárny Brno, a.s. - Combined cycle heating station Červený mlýn | 2001 |
| 280 | Proposal and tuning of control circuits for fluidized bed boiler in heating plant Komořany | United energy, a.s. - Heating station Komořany | 1999 - 2001 |
| 281 | Synchronous valve tuning in hydro power plant Vydra | ZČE, a.s. - Hydro power plant Vydra | 2001 |
| 282 | Creation of electronic documentation of the nuclear power plant Temelín–Westinghouse and DASOR systems | ČEZ, a.s. - Nuclear power plant Temelín | 2000 |
| 283 | Implementation of island operation in power plant Prunéřov 1 | ČEZ, a.s. - Power plant Prunéřov 1 | 2000 |
| 284 | Implementation of island operation in power plant Tisová 2 | ČEZ, a.s. - Power plants Tisová | 2000 |
| 285 | Implementation of superior control of steam pressure in steam collector in power plant Tisová 1 | ČEZ, a.s. - Power plants Tisová | 2000 |
| 286 | Project for real-time active power control of power plant Opatovice from the Dispatch centre in of company Východočeská energetika company | International Power Opatovice, a.s. - Power plant Opatovice | 2000 |
| 287 | Upgrade of the Communication Processor in power plant Opatovice for real-time active power control from the Dispatch centre of Pražská energetika | International Power Opatovice, a.s. - Power plant Opatovice | 2000 |
| 288 | Hydraulic tests of penstock Švařec – Čebín | Sdružení VOV | 2000 |
| 289 | Control system proposal for coal gasification technology in department Paroplyn in combined heat and power plant Vřesová | Sokolovská uhelná, právní nástupce, a.s. - Combined cycle Vřesová | 2000 |
| 290 | Guarantee measurement of Francis turbine and long penstock before reconstruction in hydro power plant Práčov | VČE, a.s. - Hydro power plant Práčov | 2000 |
| 291 | Kaplan turbines guarantee measurement in hydro power plant Žagań | ZEW Dychow, S.A. Polsko - Hydro power plant Žagań (Poland) | 2000 |
| 292 | Unit control range extension in power plants Chvaletice, Počerady and Tušimice 2 | ČEZ, a.s. | 1999 |
| 293 | Implementation of island operation in power plant Mělník 3 | ČEZ, a.s. - Power plants Mělník | 1999 |
| 294 | Guarantee measurement of dynamic and control qualities of fluidized bed boiler in power plant Tisová | ČEZ, a.s. - Power plants Tisová | 1999 |
| 295 | Backed-up system delivery for electric energy measurement for Západočeská energetika company | ZČE, a.s. | 1998 - 1999 |
| 296 | Delivery of Border substation Terminals (Albrechtice, Lískovec a Nošovice) | ČEPS, a.s. | 1998 |
| 297 | Primary frequency control optimization in hydro power plants Dalešice, Orlík, Lipno a Kamýk | ČEZ, a.s. | 1998 |
| 298 | Combustion optimization and boiler efficiency measurement in power plant Vojany 2 | Slovenské elektrárny, a.s. - Power plant Vojany (Slovakia) | 1998 |
| 299 | Delivery of Power plant terminals for power plants of ČEZ, Plc. (Chvaletice, Dalešice, Dětmarovice, Dlouhé stráně, Dukovany, Hodonín, Ledvice, Mělník, Poříčí, Počerady, Prunéřov 1, Prunéřov 2, Temelín, Tisová, Tušimice) | ČEZ, a.s. | 1994 - 1997 |
| 300 | Measuring and evaluating of system tests of UCTE/CENTREL | ČEZ, a.s. | 1995 |
| 301 | Island operation implementation including real island tests of Ostrava district in power plant Dětmarovice | ČEZ, a.s. - Power plant Dětmarovice | 1995 |
| 302 | Model of Czech electrical power system | ČEZ, a.s. | 1993 |
| 303 | Model of Slovak electrical power system | Slovenské elektrárny, a.s. | 1993 |