| No. |
Description |
Object |
Year |
| 1 | Hydro system Resita identification measurement of pumping station and hydro power plants before rehabilitation (Romania) | ČEZ Romania - Hydro system Resita (Romania) | 2011 |
| 2 | Identification measurement of Kaplan turbine before reconstruction in hydro power plant Betsele (Sweden) | E.ON Vattenkraft Sverige AB - Hydro power plant Betsele (Sweden) | 2011 |
| 3 | Guarantee measurement of Kaplan turbine in small hydro power plant Vír II | E.ON, a.s. - Small hydro power plant Vír II | 2011 |
| 4 | Performance tests of Francis turbines at hydro power plant Santa Barbara (Nicaragua) | Enel Nicaragua - Hydro power plant Santa Barbara (Nicaragua) | 2011 |
| 5 | Shutdown tests on water supply pipe at waterworks Káraný | Pražské vodárny, s.p. - Water company Káraný | 2011 |
| 6 | Optimization of on-cam correlation at Kaplan turbine in hydro power plant Orava (Slovakia) | Slovenské elektrárne, a.s. - Hydro power plant Orava (Slovakia) | 2011 |
| 7 | Measurement of pressure, vibration and noise at polyjet of hydro power plant Trollheim (Norway) | Statkraft Energi AS - Hydro power plant Trollheim (Norway) | 2010 - 2011 |
| 8 | Hydro power plants Eldforsen (Sweden) - tests relevant to Kaplan turbine during putting into operation | Hydro power plant Eldforsen (Sweden) | 2010 |
| 9 | Pressure and vibration measurement in the water spray sealing of hydro power plant Josefův Důl | Hydro power plant Josefův Důl | 2010 |
| 10 | Hydro power plant Poechos (Peru) - tests relevant to Kaplan turbines during putting into operation | Hydro power plant Poechos (Peru) | 2010 |
| 11 | Optimization of on-cam correlation on Kaplan turbine, turboset vibration and noise measurement in small hydro power plant Hracholusky | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Hracholusky | 2010 |
| 12 | Guarantee measurement of Kaplan turbine in small hydro power plant Kníničky | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Kníničky | 2010 |
| 13 | Optimization of on-cam correlation at Kaplan turbine in small hydro power plant Předměřice | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Předměřice | 2010 |
| 14 | Guarantee measurement of Kaplan turbines in small hydro power plant Spytihněv | ČEZ Obnovitelné zdroje, s.r.o. - Small hydro power plant Spytihněv | 2009 - 2010 |
| 15 | Determination of turbo-set operation diagram in hydro power plant Slapy | ČEZ, a.s. - Hydro power plant Slapy | 2003 - 2010 |
| 16 | Energetic parameters measurement and judgment of ceramic coating ARC 32 influence in cooling water pump in power plant Chvaletice | ČEZ, a.s. - Power plant Chvaletice | 2009 - 2010 |
| 17 | Governor tests of reverse Francis turbines before and after control system replacement in pump storage plant Dlouhé Stráně | ČEZ, a.s. - Pumped storage power plant Dlouhé Stráně | 2007 - 2010 |
| 18 | Guarantee measurement of Francis turbines in small hydro power plant Soběnov | E.ON Trend s.r.o. - Small hydro power plant Soběnov | 2009 - 2010 |
| 19 | Identification measurement of Francis turbines before reconstruction in hydro power plant Lapino (Poland) | ENERGA Elektrownie Straszyn Sp. z o.o. - Small hydro power plant Lapino (Poland) | 2010 |
| 20 | Guarantee measurement of Francis turbines in small hydro power plant Meziboří | Energo-Pro Czech, s.r.o. - Hydro power plant Meziboří | 2010 |
| 21 | Guarantee measurement of Pelton turbines (thermodynamics method) and governors in hydro power plant Zrnovci (Macedonia) | MacHydro Project, a.d. - Hydro power plant Zrnovci (Macedonia) | 2010 |
| 22 | Guarantee measurement of Kaplan and Francis turbines in small hydro power plant Nymburk | MVE Hydro, s.r.o. - Small hydro power plant Nymburk | 2010 |
| 23 | Guarantee measurement of Francis turbines in small hydro power plant Ampelgading (Indonesia) | PLN
Indonesia - Hydro power plant Amplegading (Indonesia) | 2010 |
| 24 | Guarantee measurement of Kaplan turbine in small hydro power plant Troja | Povodí Vltavy, s.p. - Small hydro power plant Troja | 2010 |
| 25 | Guarantee measurement of Kaplan turbine in small hydro power plant Labská | První ekologická, a.s. - Small hydro power plant Labská | 2010 |
| 26 | Guarantee measurement of Kaplan turbine in small hydro power plant Rendelstein (Italy) | Rendelstein GmbH - Small hydro power plant Rendelstein (Italy) | 2010 |
| 27 | Optimization of on-cam correlation at Kaplan turbine in hydro power plant Kostolná (Slovakia) | Slovenské elektrárne, a.s. - Hydro power plant Kostolná (Slovakia) | 2010 |
| 28 | Guarantee measurement of low-head Kaplan turbines before and after reconstruction in hydro power plant Tiszalök | Tiszavíz Vízerömü Kft - Hydro power plant Tiszalök (Hungary) | 2004 - 2010 |
| 29 | Guarantee measurement of Kaplan turbines in small hydro power plant Penz (Austria) | VAEE - Small hydro power plant Penz (Austria) | 2010 |
| 30 | Optimization of on-cam correlation on Kaplan turbine in hydro power plant Lakatnik (Bulgaria) | VEZ SVOGHE - Small hydro power plant Lakatnik (Bulgaria) | 2010 |
| 31 | Energetic parameters measurement and judgment of ceramic coating ARC 32 influence in cooling water pump in nuclear power plant Dukovany | ČEZ, a.s. - Nuclear power plant Dukovany | 2008 - 2009 |
| 32 | Turboset vibration and noise measurement before reconstruction in small hydro power plant Kníničky | ČEZ, a.s. - Small hydro power plant Kníničky | 2009 |
| 33 | Efficiency and flow measurement of Kaplan turbine in small hydro power plant Lipno II | ČEZ, a.s. - Small hydro power plant Lipno II | 2009 |
| 34 | Guarantee measurement in hydro power plants Hradištko and Kostomlátky | Energo-Pro Czech, s.r.o. - Hydro power plants Hradištko and Kostomlátky | 2007 - 2009 |
| 35 | Guarantee measurement of Pelton turbines using thermodynamics method, measurement of generator loss in hydro power plant Došnica | MacHydro Project, a.d. - Hydro power plant Došnica (Macedonia) | 2009 |
| 36 | Guarantee measurement of Pelton turbines using thermodynamics method, measurement of generator loss in hydro power plant Sapunčica | MacHydro Project, a.d. - Hydro power plant Sapuncica (Macedonia) | 2009 |
| 37 | Turboset noise measurement in small hydro power plant Nymburk | MVE - HYDRO s.r.o. - Small hydro power plant Nymburk | 2009 |
| 38 | Turboset noise measurement in small hydro power plant Kostelec nad Labem | Rida Consulting, a.s. - Small hydro power plant Kostelec nad Labem | 2009 |
| 39 | Judgement on turboset load decrease of pumped storage power plant Čierny Váh | Slovenské elektrárne, a.s. - Pumped storage power plant Číerny Váh (Slovakia) | 2009 |
| 40 | Guarantee measurement of Kaplan turbine in small hydro power plant Hracholusky | Strojírny Brno, a.s. - Small hydro power plant Hracholusky | 2009 |
| 41 | Guarantee measurement of Kaplan turbines in small hydro power plant Lakatnik and Svrajen (Bulgaria) | VEZ SVOGHE - Small hydro power plant Lakatnik and Svrajen (Bulgaria) | 2009 |
| 42 | Continual measurement of amount of cooling water from Labe river for power plant Melnik | ČEZ, a.s. - Power plants Mělník | 2008 |
| 43 | Compliance test and guarantee measurement of control circuits in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2003 - 2008 |
| 44 | Turbo-set guarantee measurement in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2003 - 2008 |
| 45 | Guarantee measurement in hydro power plant Kroměříž – Strž | Energo-Pro Czech, s.r.o. - Hydro power plant Kroměříž - Strž | 2005 - 2008 |
| 46 | Guarantee measurement of Pelton turbines and generator losses measurement in hydro power plant Patikari | Energy Infratech PVT. LTD. - Hydro power plant Patikari (India) | 2008 |
| 47 | Supervision of Kaplan turbine production in ČKD Blansko for power plant Eldforsen (Sweden) | Fortum Generation AB - Hydro power plant Eldforsen (Sweden) | 2008 |
| 48 | Guarantee measurement of Francis turbines and governors in hydro power plant Concepción | Ismus CE - Hydro power plant Concepción (Panama) | 2008 |
| 49 | Guarantee measurement of Kaplan turbines and governors and generator losses measurement in hydro power plant Matka II | MacHydro Project, a.d. - Hydro power plant Matka (Macedonia) | 2008 |
| 50 | Guarantee measurement of Pelton turbines and governors and generator losses measurement in hydro power plant Pesocani | MacHydro Project, a.d. - Hydro power plant Pesocani (Macedonia) | 2008 |
| 51 | Guarantee measurement of Pelton turbines and governors and generator losses measurement in hydro power plant Sapuncica | MacHydro Project, a.d. - Hydro power plant Sapuncica (Macedonia) | 2008 |
| 52 | Guarantee measurement of axial Kaplan turbine in small hydro power plant Rozkoš | Povodí Labe, s.p. - Small hydro power plnat Rozkoš | 2008 |
| 53 | Optimization of on-cam correlation on Kaplan Turbines in hydro power plant Líšný | TEODICEA, spol. s r.o. - Hydro power plant Líšný | 2007 - 2008 |
| 54 | Updating hydro power plants data lists according to the actual state | ČEZ, a.s. | 2003 - 2007 |
| 55 | Measurement of emergency valve stroke in hydro power plant Orlík | ČEZ, a.s. - Hydro power plant Orlík | 2007 |
| 56 | Identification measurement of Francis turbine before reconstruction in hydro power plant Meziboří | Energo-Pro Czech, s.r.o. - Hydro power plant Meziboří | 2007 |
| 57 | Identification measurement of Francis turbine in hydro power plant Seč | Energo-Pro Czech, s.r.o. - Hydro power plant Seč | 2007 |
| 58 | Guarantee measurement of Francis turbines and governors and generator losses measurement in hydro power plant Pena | MacHydro Project, a.d. - Hydro power plant Pena (Macedonia) | 2007 |
| 59 | Optimization of on-cam correlation on Kaplan turbines in hydro power plant Nechranice | Povodí Ohře, s.p. - Hydro power plant Nechranice | 2002 - 2007 |
| 60 | Kaplan turbine guarantee measurement in hydro power plant Orava | Slovenské elektrárne, a.s. - Hydro power plant Orava (Slovakia) | 2006 - 2007 |
| 61 | Control circuit tests and on-cam optimization of Kaplan turbine in hydro power plant Lipno II | ČEZ, a.s. - Hydro power plant Lipno II | 2006 |
| 62 | Turbine guarantee measurement before and after reconstruction in pumped-storage power plant Dalešice | ČEZ, a.s. - Pumped storage power plant Dalešice | 2000 - 2006 |
| 63 | Francis turbine guarantee measurement in small hydro power plant Les Království | ČEZ, obnovitelné zdroje, s.r.o. - Hydro power plant Les Království | 2006 |
| 64 | Measurement of turbo-set efficiency and penstock losses in small hydro power plant Sapunčica | MacHydro Project AD - Hydro power plant Sapunčica (Macedonia) | 2006 |
| 65 | Guarantee measurement of Francis turbines and control circuits in hydro power plant Kalimanci | MacHydro Project, a.d. - Hydro power plant Kalimanci (Macedonia) | 2006 |
| 66 | Francis turbine efficiency measurement and collection of data for reconstruction of hydro power plant Matka | MacHydro Project, a.d. - Hydro power plant Matka (Macedonia) | 2006 |
| 67 | Francis turbine efficiency measurement before reconstruction in hydro power plant Pena | MacHydro Project, a.d. - Hydro power plant Pena (Macedonia) | 2006 |
| 68 | Pelton turbine efficiency measurement before reconstruction in hydro power plant Pesocani | MacHydro Project, a.d. - Hydro power plant Pesocani (Macedonia) | 2006 |
| 69 | Pressure conditions tests in penstock of water plant Křižanovice – Práčov | Povodí Labe, s.p. - Water plant Křižanovice - Práčov | 2006 |
| 70 | Kaplan turbine guarantee measurement in hydro power plant Vraňany | Povodí Vltavy, s.p. - Hydro power plant Vraňany | 2006 |
| 71 | Turbo-set guarantee measurement before and after overhaul in hydro power plant Kisköre | Tiszavíz Vízerömü Kft - Hydro power plant Kisköre (Hungary) | 2005 - 2006 |
| 72 | Pressure conditions measurement in the supply pipeline Vír – Brno | Vírský oblastní vodovod | 2006 |
| 73 | Optimization of on-cam correlation on Kaplan Turbines in hydro power plant Žilina | Vodohospodárska výstavba, š.p. - Water plant Žilina | 2006 |
| 74 | Francis turbine guarantee measurement before and after reconstruction in hydro power plant Vydra | ZČE, a.s. - Hydro power plant Vydra | 2005 - 2006 |
| 75 | Efficiency measurement in small hydro power plant Kadaň | Hydro power plant Kadaň | 2005 |
| 76 | Measurement of passive resistances and drive forces before reconstruction in hydro power plant Považská Bystrica | Hydro power plant Povážská Bystrica (Slovakia) | 2005 |
| 77 | Kaplan turbine guarantee measurement in small hydro power plant Přelouč | Hydro power plant Přelouč | 2005 |
| 78 | Pump guarantee measurement in turbine operation mode in water purification plant in Nová Bystrica | Water purification plant Nová Bystrica (Slovakia) | 2005 |
| 79 | Turbo-set efficiency measurement in hydro power plant Lipno | ČEZ, a.s. - Hydro power plant Orlík | 2005 |
| 80 | Cause detection of excessive turbo-set vibrations in hydro power plant Slapy | ČEZ, a.s. - Hydro power plant Slapy | 2005 |
| 81 | Proposal, delivery and calibration of process flow measurement; optimization of on-cam correlation on Kaplan turbine in hydro power plant Hracholusky | ZČE, a.s. - Hydro power plant Hracholusky | 2005 |
| 82 | Determination of turbo-set working diagram in hydro power plant Orlík | ČEZ, a.s. - Hydro power plant Orlík | 2004 |
| 83 | Level measuring device delivery for hydro power plant Lipno | ČEZ, a.s. - Hydro power plant Lipno | 2003 |
| 84 | Pre-complex control system test in hydro power plant Štěchovice | ČEZ, a.s. - Hydro power plant Štěchovice | 2003 |
| 85 | Turbine control circuits tuning in hydro power plant Nechranice | Povodí Ohře, s.p. - Hydro power plant Nechranice | 2003 |
| 86 | Pump efficiency measurement in water works Káraný | Pražské vodárny, s.p. - Water company Káraný | 2003 |
| 87 | Efficiency measurement in hydro power plant Čunovo | Slovenské elektrárny, a.s. - Hydro power plant Čunovo (Slovakia) | 2003 |
| 88 | Optimization of on-cam correlation on Kaplan turbine in hydro power plant Gabčíkovo | Slovenské elektrárny, a.s. - Hydro power plant Gabčíkovo(Slovakia) | 2003 |
| 89 | Optimization of on-cam correlation on Kaplan turbines in hydro power plant Kamýk | ČEZ, a.s. - Hydro power plant Kamýk | 2002 |
| 90 | Turbine guarantee measurement after reconstruction in hydro power plant Ladce | Hydro power plant Ladce | 2001 |
| 91 | Synchronous valve tuning in hydro power plant Vydra | ZČE, a.s. - Hydro power plant Vydra | 2001 |
| 92 | Hydraulic tests of penstock Švařec – Čebín | Sdružení VOV | 2000 |
| 93 | Guarantee measurement of Francis turbine and long penstock before reconstruction in hydro power plant Práčov | VČE, a.s. - Hydro power plant Práčov | 2000 |
| 94 | Kaplan turbines guarantee measurement in hydro power plant Žagań | ZEW Dychow, S.A. Polsko - Hydro power plant Žagań (Poland) | 2000 |